BRIDGE DESIGN
OBJECTIVE: The student will construct a
model of a bridge which will support much mass as
possible.
MATERIALS:
- 30 plastic straws
- 1 roll of scotch tape
- 1 pair of scissors
- 1 ruler
- 1-8 oz cup
SKETCH:

PROCEDURE:
- Students will work in assigned
teams.
- Each team will be given the listed
materials.
- Teams will be allotted a set time to construct
a bridge using only the assigned materials.
- A place for the cup to sit must be built into
the bridge.
- The cup must sit in the center of the
bridge.
- The bridge may NOT BE WRAPPED WITH
TAPE.
- At the end of the allotted time, teams will be
instructed to stop and no more construction will be
allowed.
- While the teacher or an appointed judge is
watching, a student from the team will add pennies to the cup
until:
- the bridge falls off of the
supports.
- the cup falls off of the
bridge.
- the bridge sags enough so that any part of
the bridge touches any part of the bottom support
structure.